A Message of Faith & Structural Longevity
"In real estate, safety isn't an option—it is an absolute corporate contract. Every project we curate represents 72.5 grade steel reinforcements, structural calculations drafted to survive magnitude 7.5 earthquakes, and completely pristine land ownership documentation."
Per Square Feet Construction Cost in Bangladesh 2026 — Material & Labor Cost Breakdown
Comprehensive Multi-Storied Construction Cost in Bangladesh 2026
The per square feet construction cost in Dhaka typically ranges between ৳2,200 to ৳3,850 per sqft, depending on structural foundation depth, piling requirements, steel grades, and interior finishing fixtures.
Standard Itemized Cost Breakdown (G+9 Storied RCC Frame)
| Component / Material | Specifications & Market Rate (2026) | Approx. Cost / Sqft | Percentage of Budget |
|---|---|---|---|
| High-Tensile Deformed Rod | Grade-72 / Grade-500W @ ৳95–102 / kg | ৳550 – ৳650 / sqft | 26% |
| Portland Composite Cement | PCC / OPC @ ৳520–560 / bag | ৳320 – ৳380 / sqft | 15% |
| Coarse Aggregates & Sylhet Sand | Sylhet Red Sand (FM 2.5) & Crushed Stone | ৳220 – ৳270 / sqft | 11% |
| Civil Labor & Shuttering | Masons, rod-binders, scaffolding & casting | ৳350 – ৳420 / sqft | 17% |
| Deep Piling & Substructure | Bored cast-in-situ concrete piles (60-80 ft) | ৳280 – ৳360 / sqft | 13% |
| Finishing, Sanitary & Electrical | Tiles (24x24), CPVC plumbing, BRB wiring | ৳480 – ৳650 / sqft | 18% |
Why the Land Share Model Cuts Flat Purchase Costs by 35%–40%
In standard commercial developer models, apartments are sold at ৳5,500 – ৳8,000/sqft to cover massive advertising, office overheads, and 30%+ profit margins. Under Mollik Builders' verified Land Share Scheme, investors pay the raw construction rate of ৳3,850/sqft plus actual land share value, saving ৳18 to ৳25 Lac per home.
Related Projects
- Madina Tower — 1350 sqft, ৳46.17 Lac (10% Disc. Applied)
- Mollik City 8 — 1250 sqft (inside), ৳48,12,500
- Mollik City 9 — 1250 sqft (inside), ৳48,12,500