A Message of Faith & Structural Longevity
"In real estate, safety isn't an option—it is an absolute corporate contract. Every project we curate represents 72.5 grade steel reinforcements, structural calculations drafted to survive magnitude 7.5 earthquakes, and completely pristine land ownership documentation."
How Metro Rail is Transforming Dhaka Property Prices 2026
The Metro Rail Revolution: What It Means for Property Values
Dhaka's ambitious metro rail network is reshaping property values across the city. Areas near metro stations are seeing 15-25% price premiums compared to non-metro areas — and this trend is accelerating as more lines come online.
Completed & Planned Metro Lines (2026 Status)
| Line | Route | Status (2026) | Key Stations |
|---|---|---|---|
| MRT Line 6 | Uttara North → Kamalapur | ✅ Operational | Uttara, Agargaon, Farmgate, Motijheel |
| MRT Line 1 | Airport → Kamalapur (underground) | 🔨 Under Construction | Airport, Khilkhet, Natun Bazar, Baily Rd |
| MRT Line 5 (North) | Hemayetpur → Bhatara | 📋 Approved, Starting | Savar, Gazipur, Bhatara |
| MRT Line 4 | Kamalapur → Narayanganj | 📋 DPP Approved | Sadarghat, Narayanganj |
How North Dhaka Benefits Most
MRT Line 1 (Airport to Kamalapur via underground) will pass through Uttarkhan and Khilkhet — just minutes from Mollik Builders' projects in Dakshinkhan. Once operational, commute to Motijheel will drop from 60-70 minutes to under 30 minutes, triggering a major property value surge in this corridor.
Investment Window: Act Now Before Prices Jump
Historically, property prices near metro stations increase by 20-40% within 2 years of a metro line opening. Dakshinkhan and Uttarkhan are currently in that pre-opening sweet spot. Land share investors in Mollik City 8 & 9 (৳48 Lac) are positioned to see the highest gains.
Related Projects
- Mollik City 8 — 1250 sqft (inside), ৳48,12,500
- Mollik City 9 — 1250 sqft (inside), ৳48,12,500
- Mollik City 10 — 1250 sqft (inside), ৳48,12,500